Click to Home
Go To Search
Click to Home
Email pagePrint page
District 1 Projects
MONSTER BRIDGE

District 1 has reconstructed the bridge on 234th St. between Alfadale Rd. and Radio Rd. (a/k/a Monster Bridge). 
District 1 is working to provide a safer route of travel for the citizens in the area.
At the completion of the project, District 1 sought partial financial aid through our Circuit Engineering District to keep the taxpayers' cost as low as possible. 


PROTECTING OUR ROADS
District 1 crews have been out in the unincorporated area of our district all summer overlaying our more recent chip-sealed roads with a fresh layer. District 1 is working to preserve the roads that have seen more recent improvement as well as the reconstruction of roads in need.     (9/12/16)

RECONSTRUCTION PROJECTS COMPLETED
District 1 recently reconstructed several miles of road in the Banner area. 
Foreman Rd. from Banner Rd. to Gregory Rd was base stabilized, and chip-sealed. 
Also, Banner Rd. from Foreman Rd. to the RailRoad tracks has been base stabilized, and asphalted.  District 1 appreciates the Banner School and the Banner Co-op for their understanding and working with us to make these roads safer!

Additionally, District 1 completed a reconstruction project on 122nd St. from Highway 81 going east two miles to Alfadale Rd. then north from there one mile on Alfadale Rd. to Memorial Rd.
The scope of the project included installing new drainage structures and complete base stabilization followed with a double layer chip-seal surface.    

(updated 11/16/16)


Canadian County • 201 N. Choctaw Ave. • El Reno, OK 73036 • Phone: (405) 295-6000 • Fax: (405) 422-2429
Home Home  |  Email Page Email Page  | Print Page Print  |  Calendar  |  FAQs  |  Contact Us  |  Accessibility  |  Site Map |  Renewable Energy Windpowered | Powered by CivicPlus  | Copyright Notices